Customization: | Available |
---|---|
Type: | Arrangement Palletizer |
Automatic Grade: | Automatic |
Suppliers with verified business licenses
Our advanced servo palletizer is designed to optimize your packaging line. It automatically arranges and stacks cartons or film-wrapped products into neat pallets and builds multiple layers for efficient forklift loading. With an intuitive PLC and touchscreen control, it is simple to operate even for non-native English speakers. This system reduces labor needs and minimizes fatigue while boosting productivity.
Its versatile design allows quick switching between different products and pallet configurations without extra change parts, making it ideal for film bags, cartons, turnover boxes, and more. The compact, single-column unit integrates conveyors, carton arrangers, a palletizing main machine, layer grippers, and pallet dispensers, all managed by a robust control system.
Upgrade your packaging process with this cost-effective, high-performance servo palletizer to improve efficiency and product quality in water, beverage, and liquor production lines.
Equipment electrical configuration:
No. | Name | Supplier | Country or region |
1 | Touchscreen | Siemens | Germany |
2 | Servo motor | Inovance | China |
3 | Cylinder | AirTAC | Taiwan |
4 | The electromagnetic valve | AirTAC | Taiwan |
5 | PLC | Siemens | Germany |
6 | Frequency converter | Danvers | Denmark |
7 | Relay | Schned | France |
8 | Photoelectric switch | Sick | Germany |
9 | Proximity switch | sick | Germany |
Mineral water/Pure water/Beverage/Juice/Beer/Alcohol/Milk/Seasoning/Other bottle
1.Factory direct price(150000 sq feet modern workshop)
Q1:Are you a trading company or a manufacturer?
A1:We are an old packging machine company, specializing in conveyor system,labeling machine,water/beverage/juice/alcohol line, coding machine,palletizer. Now we are one of leading filling machine manufacturer in china.
Q2:What's your guarantee or the warranty of the quality if we buy machines?
A2:We provide quality machines with top brand.components and qualified material. Our warrantee time is 2 years after installation and commissioning, within 2 years the machines get quality problem, we will take full responsibility and provide services.
Q3:When can I get machine after I paid?
A3:We will deliver machines on time as the date we agreed both side.
Q4:How can I install my machine when it arrives?
A4:We will send our engineer to your side as soon as you get all your machines ready , for testing and teaching your technicians how to run the drinking water filling machines. Also supporting online installation.
Q5:What's the delivery time?
A5:50 days after the T/T deposit or L/C for unit machine.60-90days for project line.